Optimise for change
Early-stage architecture is guessing. Prefer arrangements that are cheap to change over ones that are optimal for a load you have not met yet, and keep the number of moving parts small enough that one person can hold them in their head.
Separate production early
Whatever else is shared, production should be its own account with its own access rules from the beginning. Retrofitting that separation after customers arrive is considerably harder.
Watch spend weekly, not monthly
A weekly look at the bill catches the mistake that a monthly look turns into a bad month. Set budget alerts at the start and treat them as signal rather than noise.


